200 Working on Alvin frame and crew sphere, installing sail, stem section with prop, Alvin ready to go
Scope and Contents
Working on Alvin frame and crew sphere. Installing Sail, stem section with prop, Alvin ready to go. The runtime for this video is 08m 49. 0:01 working on unassembled Alvin frame. 0:30 person entering sphere. 2:05 installing instruments and wiring. 2:58 moving sphere. 3:40 loading sphere on to frame. 5:45 installing propeller. 6:05 attaching front frame section. 7:40 installing rear propeller.
Dates
- Creation: 1964-1975
Conditions Governing Access
Original recordings are restricted for preservation reasons. Contact Institution Archivist for access options at dla@whoi.edu.
Extent
1 reel : 16 mm, 200 ft
Language
From the Record Group: English
General
This project was supported by a Recordings at Risk grant from the Council on Library and Information Resources (CLIR). The grant program is made possible by funding from The Andrew W. Mellon Foundation.
Repository Details
Part of the Woods Hole Oceanographic Institution, Data Library and Archives Repository